Difference between revisions of "How do I setup Stock for MRP?"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
== Job Card == | == Job Card == | ||
− | + | ;Header Details | |
*Job Card No | *Job Card No | ||
*Tool No | *Tool No | ||
Line 16: | Line 16: | ||
*Image | *Image | ||
− | + | ;Job Details | |
*Customer | *Customer | ||
*Customer PO Number | *Customer PO Number | ||
Line 36: | Line 36: | ||
*Scrap Percentage | *Scrap Percentage | ||
− | + | ;Bill of Required Materials | |
*BOM Type | *BOM Type | ||
*Our SKU | *Our SKU | ||
Line 43: | Line 43: | ||
*Location | *Location | ||
− | + | ;Workflow | |
This section is always blank for writing on. | This section is always blank for writing on. |
Revision as of 18:57, 22 January 2021
This is probably one of the most complicated parts of the system. However, setup correctly, everything will run smoothly.
Before we create the Stock Records, we need to understand how their settings contribute to the resulting Job Card, so first of all, we must understand the Job Card.
Job Card
- Header Details
- Job Card No
- Tool No
- Tool Location
- C/Insert Rqd
- C/Insert No
- Machine
- Linked Job Cards
- Golden Sample Location
- Image
- Job Details
- Customer
- Customer PO Number
- Quantity Required
- Raised Date
- Raised By
- Required By Date
- Our SKU
- Customer SKU
- Part Name
- Impressions
- Job Type
- Production Time
- Colour
- Cycle Time (seconds)
- Part Weight (g)
- Sprue Weight Per Cavity (g)
- Scrap Percentage
- Bill of Required Materials
- BOM Type
- Our SKU
- Description
- Required
- Location
- Workflow
This section is always blank for writing on.